- The Problems
- Freeways and most major/arterial roads congested and getting worse.
- Metrorail crowded in the downtown DC area
- Bus service today not a viable option for many people
- The TPR Study concluded that we cannot build enough roads to address
congestion in the long-term, even if funds were available
- Building significant numbers of new roads not realistic
- County largely built-out and land not available
- Impact on neighborhoods and quality of life creates strong opposition
- Impact to the environment also creates strong opposition
- Funds are limited
|
|
3
|
- Increase funding
- Make transit a viable travel choice
- Make road improvements to address current and near-term congestion
problems to buy time
- Implement policies
|
|
4
|
- Objective: Get projects and policies implemented
- Action required by County and often the State
- Projects need to be in the master plans
- Vast majority studied by TPR already included in master plans
- TPR concluded a few should be deleted, which Planning Board
and Council undertaking
- TPR concluded a few others should be added, which Planning Board
and Council undertaking
- Policies, bus service, and at-grade intersection improvements
not covered by master plans
- County projects
- Need Executive and Council backing
- Including them in Go Montgomery and Council Plan helpful
- Projects need to be included in CIP
- Most of bus improvements included in Operating Budget
- State Projects
- Get Council and Executive to both agree on design and ask state
to implement
- Need SHA/MTA to support and include in their proposed budgets
- Need Delegates and Governor’s support
|
|
5
|
- Plans
- Go Montgomery: Target 2015 at $9.5B (actually closer to $11.3B)
- Council: Target 2015 at $6.9B
- MCCF: No time frame (2025+) at $7.8B
- MCCF, Council and Executive agree on essentially all but a few
major projects. Major projects where agreement doesn’t exist:
- Bi-County Transitway ( All support but differences on alignment)
- Outer Purple (Exec for, Council & MCCF too expensive)
- ICC (Exec & Council for, MCCF against)
- Techway (Exec wants study, Council & MCCF against)
- Beltway widening (east of I-270) (Exec for, Council & MCCF
against under the assumption that it will require ROW)
- Montrose Parkway (Exec and Council for, MCCF opposed)
- Some projects MCCF supports not in Go Montgomery or Council plan
- Doesn’t mean they do not support them
- Means other projects should be accomplished first
|
|
6
|
|
|
7
|
|
|
8
|
|
|
9
|
- Impact taxes changed Fall 04 Old New
- Transportation Impact Taxes
- Single Family $2205 $5,500
- Multifamily $1155 $4,000
- Office $1.60/sq ft $5.00/sq ft
- Other categories
- Schools
- Single family detached zero $8,000-$12,000
- Single family attached zero $6,000-$10,000
- Affordable housing and development in enterprise zones are exempt
- Estimated revenue for FY05: $25M for schools and $19M for transportation
- Transportation typically used for County responsible items
- Local Area Transportation Review remains but needs refinement
- Developers get credit against impact tax for construction they
undertake
- Need to make sure developer improvements contribute to plan
- Policy Area Transportation Review eliminated and not replaced
with any other measure to limit the amount of total development
in any one year
|
|
10
|
|
|
11
|
- SDOT Requested COG Transportation Planning Board (TPB) to approve
the ICC for construction in the Constrained Long Range Program (CLRP)
- Construction complete by 2010
- Funding - $1.7B (from SDOT)
- $50M Special request to Congress
- $100M State revenues from sale of assets and additional federal
funds
- $450M MdTA Bonds (may add to GARVEE Bonds)
- $500M MdTA Bonds to be repaid from tolls (no final decision
to impose tolls)
- $600M GARVEE Guaranteed Bonds. Use future federal transportation
- funds to repay bonds.
- FY98-03 average federal payment was $430M/yr
- Expect it to increase - $480M to $530M/yr
- $60M per year
principle/interest cost
- Repayment of bonds from GARVEE and non-toll MdTA bonds
- $106M per year or 22% of Federal payment
- Federal payment covers entire state. If these payments come
from Montgomery and to lesser extent PG allocation of federal
funds, what will remain for other projects?
|
|
12
|
|
|
13
|
- Balanced Land Use
- Improve jobs/housing mix within planning areas to allow people
to live closer to work
- For those traveling, uses non-peak road and transit direction
capacity to exists to support demand
- Helps both road and transit
|
|
14
|
- County/WMATA study identified many limitations with the current
system
- Fix major limitations – implement grid system and add buses to
- Increase bus frequency (currently 15 to 30 minutes)
- Increase areas served – business parks and residential areas
- Increase hours of operation
- Other improvements and policies
- More information and more understandable
- Additional uses for smart cards (buses, parking lots)
- More sidewalks
- More comfortable and lower-floor buses
- More shelters
- Access to restrooms
|
|
15
|
|
|
16
|
- Transit-oriented development*
- Encourage development around transit stations and to a lesser
extent around transfer nodes to allow people to walk to the station/node
- Implement charges for parking once bus system changed to encourage
transit use
|
|
17
|
- Improve signal operation
- Time-of-day length to match volumes for non-peak periods - especially
nights and weekends
- Adjusting signal lengths can add 8% to 10% capacity to an
intersection
- Add sixth phase in ATMS to effectively add capacity to select
intersections (allow sequencing of movements to better match volumes)
- Increase people per vehicle to reduce number of vehicles on the
road
- Encourage car-pooling/van-pooling
- Add HOT to HOV lanes on I-270 and Beltway if widened
|
|
18
|
- Build 27 grade-separated interchanges [State $1.5B, most priority
3]*
- Primary congestion points addressed
- Adds 150% to 250% in capacity and benefits both N-S and E-W
travel
- Top speed doesn’t increase but eliminating much of stop time
increases average speed
- Retain traffic signals at arterial/residential streets to
meter traffic to allow people to exit their houses/businesses
- Series of interchanges more a benefit than isolated interchanges
– create corridors
- Randolph/Montrose
- US29
- MD 198-MD28
- MD 355
- Upgrade intersections improvement [State $79M]
|
|
19
|
|
|
20
|
|
|
21
|
|
|
22
|
- Metrorail
- Add cars and run all trains to end of lines [MD, VA, DC; $12.2
B 2004 to 2010 , priority 3+]
- Add station at Montgomery College [Metro, priority 3]
- New systems (high speed, high capacity equivalent to freeways)
- Build Corridor Cities Transitway [State $700M, priority 3]*
- Build Bi-County Transitway (Inner Purple Line), Bethesda to New Carrolton [State, $1.2B,
priority 2 with conditions]*
- Build Inner Purple Line spur from Langley Park to White Oak
[State, $198M, priority 2]*
- Build Georgia Ave Busway from Glenmont to Olney [State, $69M,
Priority 3]*
- Extend Red Line from Shady Grove to Metropolitan Grove [State,
$924M, priority 3-]*
- Extend Purple line to Tysons Corner [State $963M, priority 2-]
- Build Outer Purple Line [State, $5B, Priority 1]
- Possible technologies for new system not specified by MCCF since
should be part of study
- Heavy rail - Light rail
- Bus rapid transit - Mono-beam
|
|
23
|
|
|
24
|
- Few new roads planned since land is not available
- Projects:
- Eastern Connector (US29 to US1 on ICC ROW)[State $116M, priority
2-]
- Montrose Parkway (MCCF opposes but County decided to build)
- [County $113M]
- Midcounty Highway
- MD 124 to MD 27 (MCCF recommends study) [State $207M]
- MD 27 to Middlebrook [Included in above line]
- Stringtown Rd to Md 355 [State
$14M, priority 2-]
- Western Connector
- Follow ICC ROW I-370 to MD 28 (Planning Board), [State $98M]
- Widen Muncaster Mill (MCCF) [State, $77M]
- Brookeville Bypass [State, $33M, priority 3]
- Hyattstown Bypass [State, $5M]
|
|
25
|
|
|
26
|
- I-270 North Region (Gaithersburg north) – all are MCCF priority
2
- Widen Clopper Rd, MD 121 to MDS 124,
& Seneca Park to MD 118 [State $145M]
- Widen Clopper Rd, I-270 to Seneca Park*
- Extend Father Hurley Blvd*, Wisteria to MD 118 [ State, $5M]
- Goshen Rd, Gaithersburg to Warfield Rd [State $18M]
- Widen Great Seneca, Darnestown Rd to Middlebrook Rd* [$18M]
- Widen Longdraft, MD 124 to MD 117 [County $20M]
- Widen MD 118*, Clopper to Seneca Creek [State $78M]
- Widen MD 118*, Watkins Mill to I-270 [State $6M]
- Widen MD 121*, Stringtown to Newcut [State $21M]
- Widen MD 355*, Brink to Midcounty [State $40M]
- Widen Middlebrook*, MD 118 to MidCounty [County $12M]
- Widen Muddy Branch*, West Diamond to Darnestown [State, $60M]
- Widen/Extend Newcut Rd *, MD 121 to MD 27 [State, $63M]
- Widen Ridge Rd, MD 355 to Skylark [State$33M]
- Widen Ridge Rd*, MD 355 to MD 108 [State $108M]
- Widen Shady Grove*, Brairdale to I-370 [State, $8M]
- Widen Snouffer School, , Goshen to Mooney, MCCF recommends study
[$22M]
- Widen Stringtown*, I-270 to MD 355 [ $20M]
- Extend Watkins Mill, MD 355 to Clopper,
MCCF recommends study [County $34M]
- Widen Woodfield Rd*, Midcounty to Warfield and extend to Ridge
[State $170M]
|
|
27
|
|
|
28
|
- Developer builds local residential streets under subdivision process
- Issue is not congestion but cut-thru traffic and speeding
- Most cut-thru occurs because of congested major/arterial roads
- County builds short business roads/segments to address local congestion
- Chapman Extended* [County $63M]
- Citadel extension* [County $2M]
- Nebel St* [County $10M]
- Burtonsville Access Rd, [County]
- Observation Dr, [County]
- Rainbow Dr, extend to Thompson [County]
- Others
|
|
29
|
- Build new ones (MCCF opposes)
- ICC, I-270 Gaithersburg to I-95 south of MD 198 [State $1.7B+]
- Techway or Techway Light, another Potomac Crossing near MD 118
and widen other roads to support [State $408M]
- Improve existing ones
- Widen Beltway by adding one HOV lane in each direction [State
$578M]
- MCCF Executive Board supports from west spur to VA when VA
builds HOV lanes
- MCCF opposes east of I-270
based upon assumption that it would not fit in right-of-way
(ROW) – State now claiming lanes can be added within ROW
- Widen I-270 by adding HOV from MD 124 to I-70* [State $1.2B]
- Widen I-270 spurs
- West side* [State $68M]
- East side [State $68M]
- Add 3 interchanges to I-270* [State $50M]
|
|